제품소개

YoungKwang의 최고의 품질 제품들을 소개합니다.

·Client

Jord International

·PJT

WHCP2021 Cashiriari Wellhead Compression

·Item

1st Stage Compress Suction Scrubber

·Material

SA516-70N

·Size

t100mm x I.D 2,540mm x T.L 3,884mm

·Weight

48 ton

·Client

Daewoo E&C

·PJT

Ammonia and urea fertilizer factory for Train-2

·Item

Slug Catcher (2 sets)

·Material

SA516-70+316 Clad

·Size

t(95+3)mm x I.D 2,700mm x T.L 10,800mm

·Weight

95 Ton

·Client

Lotte Chemical

·PJT

TE-3 Project (Naphtha Cracking Center Expansion)

·Item

Quench Exchanger Steam Drum

·Material

SA516-70N

·Size

t80mm x I.D 1,500mm x T.L 5,000mm

·Weight

25 ton

·Client

Cheil Industries

·PJT

CPC2 65,000 MTY

·Item

-

·Material

SA516-70N

·Size

12T x 4,400mm I.D x 9,700L

·Weight

10.2 ton

·Client

Lotte Chemical (Lotte E&C)

·PJT

HC2 PJT

·Item

E-19321(H-BKM)

·Material

Shell : SA516-70 / Tube : SA179

·Size

18 t x / I.D 2300mm & 3190mm x 6000 T.L

·Weight

67.3 ton

·Client

Lotte Chemical (Lotte E&C)

·PJT

HC2 PJT

·Item

E-1815(V-BEM Type)/I.D2330 x 8987 T.L

·Material

Shell : SA516-70N / Tube : SA213-TP304

·Size

Steel : 800 ton Coil : 7,200 D.I

·Weight

70.8 ton

·Client

Lotte Chemical (Lotte E&C)

·PJT

HC2 PJT

·Item

E-1921(H-BKU)&E-1922(H-BJM)

·Material

Shell : SA516-70N / Tube : SA179

·Size

Thickness : 13 mm / 13 mm

·Weight

8.3 / 30.3 ton

·Client

Lotte E&C / HC2 PJT

·PJT

E-1935 (V-BEM)/ I.D 1620 x 3800 T.L

·Item

-

·Material

Steel : SA516-70
Tube : SA179 / Bellows : Alloy 625

·Size

Shell Thickness : 30 mm

·Weight

-

·Client

Samsung Total Petrochemicals

·PJT

No.2 Aromatics Complex

·Item

-

·Material

Steel : SA516-70

·Size

22t x 4,700 I.D x 47,400 L

·Weight

624 ton

·Client

Lotte Chemical & Hyundai Engineering

·PJT

LPC2

·Item

-

·Material

SA240-304L

·Size

47 mm x 2,050 I.D x 42,270 L

·Weight

410 ton

·Client

Cheil Industries Ltd

·PJT

CPC2 (65,000 MTY)

·Item

-

·Material

SA240-304

·Size

16mm x 3,000 I.D x 45,000 L

·Weight

249.6 ton

·Client

Lotte Chemical & Hyundai Engineering

·PJT

LPC2

·Item

-

·Material

Steel : A240-304L

·Size

16 mm x 2,000 I.D x 35,000 L

·Weight

99.2 ton

·Client

Air Liquid (e-TEC E&C)

·PJT

ALK Y4 Project

·Item

-

·Material

SA516-70N

·Size

23mm x 1,700 I.D x 23,100 L

·Weight

98.0 ton

·Client

Lotte Chemical (Lotte E&C)

·PJT

HC2 Project

·Item

First EC Reactor

·Material

SA516-70 +SS 304L Clad

·Size

t(117+3)mm x I.D 2,300mm x T.L 9,200mm

·Weight

97ton

Piping Spool

Process Piping

Piping Reference

(5). Pipe Spool Reference List
No.
Customer/ End User
Project
Item
Q'ty
Delivery
Material
Dimension (mm)
Weight (Ton)
년도
ID t L
1 Husky Energy Spruce Lake North SLA Pad Ship Loose Pipe 1 On-Going A106B 2019
2 Husky Energy Spruce Lake North SLD Pad Ship Loose Pipe 1 On-Going A106B 2019
3 Husky Energy Spruce Lake North CPF 509 Ship Loose Pipe 1 On-Going A106B 2019
4 Husky Energy Spruce Lake Central SLB Pad Ship Loose Pipe 1 On-Going A106B 2019
5 Husky Energy Spruce Lake Central SLC Pad Ship Loose Pipe 1 On-Going A106B 2019
6 Husky Energy Spruce Lake Central CPF 509 Ship Loose Pipe 1 On-Going A106B 2019
7 Husky Energy Vawn VC2 Pad Ship Loose Pipe 1 2018.12 A106B 2018
8 Husky Energy Dee Valley DA Pad Ship Loose Pipe 1 2018.11 A106B 2018
9 Husky Energy Celtic CN Pad Ship Loose Pipe 1 2018.08 A106B 2018
10 Husky Energy Dee Valley DB Pad Ship Loose Pipe 1 2018.07 A106B 2018
11 Husky Energy Dee Valley CPF 509 Ship Loose Pipe 1 2018.06 A106B 2018
12 Husky Energy Vawn VC Pad Ship Loose Pipe 1 2018.05 A106B 2018
13 Jord International C6721 Imperial Sugar GAC Ship Loose Pipe 1 2018.04 2017
14 Husky Energy Edam East EC Pad Ship Loose Pipe 1 2018.03 A106B 2017
15 Husky Energy Rush Lake Commercial 2 CPF 509 Ship Loose Pipe 1 2017.10 A106B 2017
16 Burckhardt Compression AG/ DSME HN.2435/36 Pipe Spool 6 2017.04 A312 TP316L 2016
17 Burckhardt Compression AG/ DSME HN.2417 Pipe Spool 6 2017.02 A312 TP316L 2016
18 Burckhardt Compression AG/ DSME HN.2153/54 Pipe Spool 6 2016.12 A312 TP316L 2016
19 Burckhardt Compression/POSCO POSCO SNG Pipe Spool 1Lot 2014.01 2013
20 Burckhardt Compression /Samsung Total Samsung Daesan 03,04 Pipe Spool 1Lot 2013.12 2013
21 Burckhardt Compression/POSCO POSCO GWANGYANG Pipe Spool 1 2013.11 2013
22 Hyundai Heavy Ind. AL Dur Power & Water Company B.S.C© AL Dur Independent Water and Power Fabrication Pipe Spool 1 2010.01 2009
23 Hyundai Heavy Ind. Escravos Gas Proj Phase3(EGP3) Tie-in Spool (G05011-086-04) 1 2006.09 2006
24 Hyundai Heavy Ind. Escravos Gas Proj Phase3(EGP3) Tie-in Spool / Tie-in Spool Support (G05011-086-04) 25 2006.09 2006
25 Hyundai Heavy Ind. Escravos Gas Proj Phase3(EGP3) Tie-in Spool (G05011-086-01~03) 13 2006.01 2005
26 Hyundai Heavy Ind. Saudi Aramco Cogeneration Program(UGP) Pipe Spool Fabrication 3 2005.06 2005
27 Hyundai Heavy Ind. Saudi Aramco Cogeneration Program(UGP) Pipe Spool Fabrication 3 2005.05 2005
28 Samsung Total Petrochemicals. No.2 Aromatics Complex Project /Desan, Korea Process piping 2013.04 A335P9, A312TP310, A312TP347H 2012
29 DeokYang Co.,Ltd. HC-Project (Steam Reformer package H-211) /Ulsan, Korea Process piping 2013.09 A106GrB, A335P11, A335P22, A312TP304H 2013
30 Aramco / GS E&C Rabigh II (CP-3/4) Project (P220-FR-2301/2302) / Saudi Arabia Process piping 2014.1 A335Gr11, A312TP310 2014
31 Hyosung Ulsan DH-2P / Ulsan,Korea Process piping 2014.11 A106GrB 2014
32 State Oil Company / Samsung Engineering Co.,Ltd SOCAR Ammonia & Urea Complex(Steam Reformer & Start-up heater)/Azerbaijan Republic Process piping 2015. 05 A312 TP347, TP321, TP304H, A335P11, P22 & A106GRB 2014
33 Samsung Total Petrochemicals / Samsung C&T STC SM#1 Modernization Project /Desan, Korea Process piping 2015.05 A297HP Modified, 800HTB409, TP304H, A312TP310, A312TP347H 2014
34 ADCO / GS E&C Rumaitha/shanayel Phase-III Project /Abu Dhabi, UAE Process piping 2015.07 A106GRB 2015
35 Turkmengas / Toyo-K ECU & PE-PP Project Process piping 2015.12 A106GRB 2015
36 KNPC / GS E&C KNPC Clean Fuel Project _Reformer Package / Kuwait Process piping 2016.05 A312TP304H, 321H,A335P11,P22 & A106GRB 2015
37 KNPC / GS E&C KNPC Clean Fuel Project _Fired Heater Package / Kuwait Process piping 2016.03 A106GRB, A312TP347H & TP310 2015
38 S-OIL / DAELIM S-OIL RUC Project _Fired Heater Fabrication & Erection Process piping 2016.08 A312TP347H & TP304 2016
39 TE-3 / GS E&C TE-3 Project_Flue Gas Cooler Process piping 2016.1 A106GRB,A312TP304 2016
40 OCI OCI BTX DBNK Project Process piping 2016.1 A312 TP321 2016
41 SK ENERGY SK NO.2 FCC Project Fabrication & Erection Process piping 2016.11 A335 P22 2016
42 S-OIL / DAELIM S-OIL RUC Project _Burner Piping Fabrication & Erection Process piping 2017.09 A106 GR.B 2017
43 SK ENERGY SK NO.1 FCC DBNK Project Process piping 2017.04 SS304 2017
44 DeokYang Co.,Ltd. DeokYang # 3 Factory E-213 Revamping Project Process piping 2017.03 A335 P11 2017
45 Hyundai Oil Bank Co., Ltd HDO SDA Project Hot Oil Heater Fabrication & Erection / Korea Process piping 2018.04 A106 GR.B 2017
46 DeokYang Co.,Ltd. DY HC-2 Project Steam Reformer Fabrication / Korea Process piping 2018.04 Coil 6,160 D.I 2017
47 GS E&C LPIC-3 WHRU PROJECT / OMAN Process piping 2018.05 A335 P22 2017
48 Hyundai Oil Bank Co., Ltd HDO Revamping Project / Fabrication & Erection / Korea Process piping 2018.08 TP347H 2018
49 Lotte Chemical MEX 3 Project / Fabrication & Erection / Korea Process piping 2019.04 A106 GR.B 2018
50 Hancha Chemical VCM-3 Project / Process piping 2019.03 B407 800H, A312 TP347H, A335 P5 2019
51 GS CALTEX MFC Project Process piping 2020.08 A106 GR.B, TP304H, A335 P11, HP Modified 2019

주요실적

No. Customer/ End User Project Item Q’ty Delivery Material Dimension (mm) Weight (Ton) 년도
ID t L
1 WOONGJIN COWAY ENTEC ADNOC CFP WTP PROJECT VESSEL 21 On-Going SA516-70N 3600 23 3500 183 2019
2 Lotte E&C B PROJECT VESSEL 34 On-Going SA240-304L 4200 30 9300 220 2019
3 MCNS REACTOR FABRICATION REACTOR 3 On-Going SA240-316L 3000 14 4400 42 2019
4 SATCO IEFCL 1562 REACTOR 2 On-Going SA516-70+316L 2700 95+3 10800 190 2019
5 Lotte E&C MeX3 Projcet Column 2 On-Going SA516-70N 5300 47 24800 400 2019
6 Lotte E&C MeX3 Projcet Vessel 21 On-Going SA516-70N 4200 29 13500 274 2019
7 Husky Oil Operation 10000 BPD SAGD TEMPLATE Test Separator 4 On-Going SA516-70N 1981 38 6096 75 2019
5 E-TECH E&C ALK Y4 COLUMN 2 2019.03 A516-70/316L 1700 23 23100 98 2018
9 SATCO Feed Purifier Vessel 1 2019.03 SA516-70N 2300 55 11000 45 2018
10 Solvay Korea D61200 Column 1 On-Going SA240-304L 3000 15 13900 22 2019
11 Lotte E&C HC2 Project Vessel 6 2019.04 SA516-70N+S5 4700 50 26000 260 2018
12 Lotte E&C HC2 Project Tower & Reactor 2 2018.11 SA516-70N 2300 120 8700 88 2018
13 Husky Oil Operation Well Pad Long Lead Program Test Separator 3 2018.11 SA516-70N 1981 38 6096 56 2018
14 Hyundai Engineering LPC2 Project Tower 8 2018.11 SA240-304 / 316 2050 42 42270 410 2018
15 Jord International Pty Ltd WHCP 2021 – Cashiriari Well Head Compression Project Scrubber 3 2018.09 SA516-70N 2540 100 6440 92 2018
16 TOYO ENG KD Project Reactor 14 2018.09 SA240-310S 1150 8 1150 16 2018
17 TOYO ENG KD Project Pressure Vessel 4 2018.09 SA240-304L 1200 11 2950 5 2018
18 Jord International Pty Ltd Wodgina Lithium 6% Li2O Project Receiver Tank 2 2018.06 SA516-70N 1484 8 2568 3 2018
19 Husky Oil Operation Dee Vally Project (DB-PAD) Test Separator 1 2018.05 SA516-70N 1981 38 6096 19 2018
20 Husky Oil Operation Dee Vally Project (DA-PAD) Test Separator 1 2018.05 SA516-70N 1981 38 6096 18.6 2018
21 Jord International Pty Ltd Byerwen Project Receiver Tank 1 2018.04 SA516-70N 2496 10 2500 3.7 2017
22 Cryostar Eugene Project Desuperheater 1 2018.03 SA240-304L 330.2 6 2650 0.52 2017
23 Jord International Pty Ltd Mount Marion Lithium – 6% Upgrade Project Receiver Tank 1 2018.03 SA516-70N 2000 8 2600 2.6 2017
24 Jord International Pty Ltd Mount Marion Lithium – 6% Upgrade Project Receiver Tank 1 2018.03 SA516-70N 1484 8 2568 1.5 2017
25 Husky Oil Operation Vawn Project Test Separator 1 2018.01 SA516-70N 1981 38 6096 18.6 2017
26 Husky Oil Operation Edam East Project Test Separator 1 2018.01 SA516-70N 1981 38 6096 18.6 2017
27 Husky Oil Operation Pikes Peak South Project Test Separator 1 2018.01 SA516-70N 1981 38 6096 18.6 2017
28 Cryostar STARLITE XS – Small Scale Liquefaction Unit Buffer Tank 1 2018.03 SA516-70 1000 16 2356 2.2 2017
29 Cryostar STARLITE XS – Small Scale Liquefaction Unit Inventory Tank 1 2018.03 SA516-70N 1776 28 3500 8.5 2017
30 Husky Oil Operation Rush Lake Commercial 2 P/Q/Pads Test Separator 1 2017.08 SA516-70N 1981 38 6096 37.2 2017
31 KPX Green Chemical AM Project Tower 1 2016.08 SA240-316 1100 9 21500 9.8 2016
No.Customer/ End UserProjectItemQ’tyDeliveryMaterialDimension (mm)Weight (Ton)년도
IDtL
1MCNSCondensor ProjectHeat Exchanger2On-GoingSA516-70600925002.52019
2JORD INTERNATIONALKWINANA NICKEL RERINERY PROJECTHeat Exchanger1On-GoingS31803218210950025.12019
3Lotte E&CMeX3 ProjectHeat Exchanger9On-GoingSA516-702190136300662019
4Lotte E&CHC2 ProjectHeat Exchanger152018.09SA240-30431901860003362018
5SHISN2197/98Water Heater22018.03SA240-304370619811.22017
6CryostarSTARLITE XS – Small Scale Liquefaction UnitDesuper Heater12018.03SA312-TP304L330.2626500.52017
No.Customer/ End UserProjectItemQ’tyDeliveryMaterialDimension (mm)Weight (Ton)년도
IDtL
1John Zink Hamworthy CombustionBLNG PROJECTFlare Stack12015A106-B333.359.5410.692015
2John Zink Hamworthy CombustionHEC TACE ProjectFlare Stack Pakage12015A516-70n+S5170032100,000502015
3John Zink International Luxembourg /Saudi AramcoShaybah#1B58-U-0001A/B22013A516-7030001458,0001502013
4Shaybah#1B58-U-0002A/B/C32013A516-7010661481,2001202013
5Shaybah#1B58-U-000612013A516-701,2191058,00082013
6Shaybah#4B25-F-0004A12013A516-701,2191292,800502013
7Shaybah#4B01/03-F0002A/0004A42013A516-701,0661292,8001802013
8Shaybah#4B07-F-0004A12013A516-706101046,400112013
No.Ship YardHull No.TYPEMaterialDimension (mm)Weight (Ton)Delivery
GCU ASS’YOuter Casing (shell)Inner Cylinder (shell)
Outer CasingInner CylinderO.DLO.DTLO.DTL
1HSHIHNS6274500Carbon SteelSUS 316L450011095403088267358057455242014.08
2SHIHN19425600Carbon SteelSUS 316L500012916451089742401058795272014.05
3HHIHN2567SUSSUS 304LSUS 316L450011095403058267358057455242014.04
4DSMEHN22924500Carbon SteelSUS 316L450012320403089492358058680262014.03
5HSHIHNS6264500Carbon SteelSUS 316L450011095403088267358057455242014.02
6HHIHN2566SUSSUS 304LSUS 316L450011095403058267358057455242014.01
7SHIHN19415600Carbon SteelSUS 316L burner500012916451089742401058795272013.10
8HHIHN2565SUSSUS 304LSUS 316L burner450011095403058267358057455242013.07
9SHIHN19215600Carbon SteelSUS 316L burner500012916451089742401058795272013.07
10HHIHN25505600Carbon SteelSUS 316L500012916451089742401058795272013.06
11SHIHN19205600Carbon SteelSUS 316L burner500012916451089742401058795272013.05
12HHIHN25485600Carbon SteelSUS 316L500012916451089742401058795272013.04
13HHIHN2558SUSSUS 304LSUS 316L450011095403058267358057455242013.03
14DSMEHN22914500Carbon SteelSUS 316L450012320403089492358058680262013.03
15HSHIHNS6254500Carbon SteelSUS 316L450011095403088267358057455242013.02
16DSMEHN24025600Carbon SteelSUS 316L500012916451089742401058795272013.01
17DSMEHN22964500Carbon SteelSUS 316L450012320403089492358058680262012.12
18HSHIHNS6244500Carbon SteelSUS 316L450011095403088267358057455242012.11
19HHIHN2557SUSSUS 304LSUS 316L450011095403058267358057455242012.10
20HHIHN2580SUSSUS 304LSUS 316L450011095403058267358057455242012.09
21DSMEHN22904500Carbon SteelSUS 316L450012320403089492358058680262012.08
22HHIHN2556SUSSUS 304LSUS 316L450011095403058267358057455242012.08
23DSMEHN22954500Carbon SteelSUS 316L450012320403089492358058680262012.07
24DSMEHN22894500Carbon SteelSUS 316L450012320403089492358058680262012.06
25DSMEHN22884500Carbon SteelSUS 316L450012320403089492358058680262012.05
No.Customer/ End UserProjectItemQ’tyDeliveryMaterialDimension (mm)Weight (Ton)년도
IDtL
1Husky EnergySpruce Lake North SLA PadShip Loose Pipe1On-GoingA106B    2019
2Husky EnergySpruce Lake North SLD PadShip Loose Pipe1On-GoingA106B    2019
3Husky EnergySpruce Lake North CPF 509Ship Loose Pipe1On-GoingA106B    2019
4Husky EnergySpruce Lake Central SLB PadShip Loose Pipe1On-GoingA106B    2019
5Husky EnergySpruce Lake Central SLC PadShip Loose Pipe1On-GoingA106B    2019
6Husky EnergySpruce Lake Central CPF 509Ship Loose Pipe1On-GoingA106B    2019
7Husky EnergyVawn VC2 PadShip Loose Pipe12018.12A106B    2018
8Husky EnergyDee Valley DA PadShip Loose Pipe12018.11A106B    2018
9Husky EnergyCeltic CN PadShip Loose Pipe12018.08A106B    2018
10Husky EnergyDee Valley DB PadShip Loose Pipe12018.07A106B    2018
11Husky EnergyDee Valley CPF 509Ship Loose Pipe12018.06A106B    2018
12Husky EnergyVawn VC PadShip Loose Pipe12018.05A106B    2018
13Jord InternationalC6721 Imperial Sugar GACShip Loose Pipe12018.04     2017
14Husky EnergyEdam East EC PadShip Loose Pipe12018.03A106B    2017
15Husky EnergyRush Lake Commercial 2 CPF 509Ship Loose Pipe12017.10A106B    2017
16Burckhardt Compression AG/ DSMEHN.2435/36Pipe Spool62017.04A312 TP316L    2016
17Burckhardt Compression AG/ DSMEHN.2417Pipe Spool62017.02A312 TP316L    2016
18Burckhardt Compression AG/ DSMEHN.2153/54Pipe Spool62016.12A312 TP316L    2016