제품소개
Introduction of item
Introducing YoungKwang’s products by part.
·Client
Cheil Industries
·PJT
CPC2 65,000 MTY
·Item
-
·Material
·Size
12T x 4,400mm I.D x 9,700L
·Weight
10.2 ton
·Client
Lotte Chemical
·PJT
TE-3 Project (Naphtha Cracking Center Expansion)
·Item
Quench Exchanger Steam Drum
·Material
·Size
t80mm x I.D 1,500mm x T.L 5,000mm
·Weight
25 ton
·Client
Jord International
·PJT
WHCP2021 Cashiriari Wellhead Compression
·Item
1st Stage Compress Suction Scrubber
·Material
·Size
t100mm x I.D 2,540mm x T.L 3,884mm
·Weight
48 ton
·Client
Daewoo E&C
·PJT
Ammonia and urea fertilizer factory for Train-2
·Item
Slug Catcher (2 sets)
·Material
·Size
t(95+3)mm x I.D 2,700mm x T.L 10,800mm
·Weight
95 Ton
·Client
Lotte Chemical (Lotte E&C)
·PJT
HC2 PJT
·Item
E-19321(H-BKM)
·Material
·Size
18 t x / I.D 2300mm & 3190mm x 6000 T.L
·Weight
67.3 ton
·Client
Lotte Chemical (Lotte E&C)
·PJT
HC2 PJT
·Item
E-1815(V-BEM Type)/I.D2330 x 8987 T.L
·Material
·Size
Steel : 800 ton Coil : 7,200 D.I
·Weight
70.8 ton
·Client
Lotte Chemical (Lotte E&C)
·PJT
HC2 PJT
·Item
E-1921(H-BKU)&E-1922(H-BJM)
·Material
·Size
Thickness : 13 mm / 13 mm
·Weight
8.3 / 30.3 ton
·Client
Lotte E&C / HC2 PJT
·PJT
E-1935 (V-BEM)/ I.D 1620 x 3800 T.L
·Item
-
·Material
·Size
Shell Thickness : 30 mm
·Weight
-
·Client
Lotte Chemical (Lotte E&C)
·PJT
HC2 PJT
·Item
E-19321(H-BKM)
·Material
·Size
18 t x / I.D 2300mm & 3190mm x 6000 T.L
·Weight
67.3 ton
·Client
Cheil Industries Ltd
·PJT
CPC2 (65,000 MTY)
·Item
-
·Material
·Size
16mm x 3,000 I.D x 45,000 L
·Weight
249.6 ton
·Client
Lotte Chemical & Hyundai Engineering
·PJT
LPC2
·Item
-
·Material
·Size
16 mm x 2,000 I.D x 35,000 L
·Weight
99.2 ton
·Client
Air Liquid (e-TEC E&C)
·PJT
ALK Y4 Project
·Item
-
·Material
·Size
23mm x 1,700 I.D x 23,100 L
·Weight
98.0 ton
·Client
Lotte Chemical & Hyundai Engineering
·PJT
LPC2
·Item
-
·Material
·Size
47 mm x 2,050 I.D x 42,270 L
·Weight
410 ton
·Client
Samsung Total Petrochemicals
·PJT
No.2 Aromatics Complex
·Item
-
·Material
·Size
22t x 4,700 I.D x 47,400 L
·Weight
624 ton
·Client
Samsung Total Petrochemicals
·PJT
No.2 Aromatics Complex
·Item
-
·Material
·Size
22t x 4,700 I.D x 47,400 L
·Weight
624 ton
·Client
Lotte Chemical & Hyundai Engineering
·PJT
LPC2
·Item
-
·Material
·Size
47 mm x 2,050 I.D x 42,270 L
·Weight
410 ton
·Client
Cheil Industries Ltd
·PJT
CPC2 (65,000 MTY)
·Item
-
·Material
·Size
16mm x 3,000 I.D x 45,000 L
·Weight
249.6 ton
·Client
Lotte Chemical & Hyundai Engineering
·PJT
LPC2
·Item
-
·Material
·Size
16 mm x 2,000 I.D x 35,000 L
·Weight
99.2 ton
·Client
Air Liquid (e-TEC E&C)
·PJT
ALK Y4 Project
·Item
-
·Material
·Size
23mm x 1,700 I.D x 23,100 L
·Weight
98.0 ton
·Client
Lotte Chemical (Lotte E&C)
·PJT
HC2 Project
·Item
First EC Reactor
·Material
·Size
t(117+3)mm x I.D 2,300mm x T.L 9,200mm
·Weight
97ton
Piping Spool
Process Piping
Piping Reference
(5). Pipe Spool Reference List | |||||||||||
No. |
Customer/ End User |
Project |
Item |
Q'ty |
Delivery |
Material |
Dimension (mm) |
Weight (Ton) |
년도 |
||
ID | t | L | |||||||||
1 | Husky Energy | Spruce Lake North SLA Pad | Ship Loose Pipe | 1 | On-Going | A106B | 2019 | ||||
2 | Husky Energy | Spruce Lake North SLD Pad | Ship Loose Pipe | 1 | On-Going | A106B | 2019 | ||||
3 | Husky Energy | Spruce Lake North CPF 509 | Ship Loose Pipe | 1 | On-Going | A106B | 2019 | ||||
4 | Husky Energy | Spruce Lake Central SLB Pad | Ship Loose Pipe | 1 | On-Going | A106B | 2019 | ||||
5 | Husky Energy | Spruce Lake Central SLC Pad | Ship Loose Pipe | 1 | On-Going | A106B | 2019 | ||||
6 | Husky Energy | Spruce Lake Central CPF 509 | Ship Loose Pipe | 1 | On-Going | A106B | 2019 | ||||
7 | Husky Energy | Vawn VC2 Pad | Ship Loose Pipe | 1 | 2018.12 | A106B | 2018 | ||||
8 | Husky Energy | Dee Valley DA Pad | Ship Loose Pipe | 1 | 2018.11 | A106B | 2018 | ||||
9 | Husky Energy | Celtic CN Pad | Ship Loose Pipe | 1 | 2018.08 | A106B | 2018 | ||||
10 | Husky Energy | Dee Valley DB Pad | Ship Loose Pipe | 1 | 2018.07 | A106B | 2018 | ||||
11 | Husky Energy | Dee Valley CPF 509 | Ship Loose Pipe | 1 | 2018.06 | A106B | 2018 | ||||
12 | Husky Energy | Vawn VC Pad | Ship Loose Pipe | 1 | 2018.05 | A106B | 2018 | ||||
13 | Jord International | C6721 Imperial Sugar GAC | Ship Loose Pipe | 1 | 2018.04 | 2017 | |||||
14 | Husky Energy | Edam East EC Pad | Ship Loose Pipe | 1 | 2018.03 | A106B | 2017 | ||||
15 | Husky Energy | Rush Lake Commercial 2 CPF 509 | Ship Loose Pipe | 1 | 2017.10 | A106B | 2017 | ||||
16 | Burckhardt Compression AG/ DSME | HN.2435/36 | Pipe Spool | 6 | 2017.04 | A312 TP316L | 2016 | ||||
17 | Burckhardt Compression AG/ DSME | HN.2417 | Pipe Spool | 6 | 2017.02 | A312 TP316L | 2016 | ||||
18 | Burckhardt Compression AG/ DSME | HN.2153/54 | Pipe Spool | 6 | 2016.12 | A312 TP316L | 2016 | ||||
19 | Burckhardt Compression/POSCO | POSCO SNG | Pipe Spool | 1Lot | 2014.01 | 2013 | |||||
20 | Burckhardt Compression /Samsung Total | Samsung Daesan 03,04 | Pipe Spool | 1Lot | 2013.12 | 2013 | |||||
21 | Burckhardt Compression/POSCO | POSCO GWANGYANG | Pipe Spool | 1 | 2013.11 | 2013 | |||||
22 | Hyundai Heavy Ind. | AL Dur Power & Water Company B.S.C© | AL Dur Independent Water and Power Fabrication Pipe Spool | 1 | 2010.01 | 2009 | |||||
23 | Hyundai Heavy Ind. | Escravos Gas Proj Phase3(EGP3) | Tie-in Spool (G05011-086-04) | 1 | 2006.09 | 2006 | |||||
24 | Hyundai Heavy Ind. | Escravos Gas Proj Phase3(EGP3) | Tie-in Spool / Tie-in Spool Support (G05011-086-04) | 25 | 2006.09 | 2006 | |||||
25 | Hyundai Heavy Ind. | Escravos Gas Proj Phase3(EGP3) | Tie-in Spool (G05011-086-01~03) | 13 | 2006.01 | 2005 | |||||
26 | Hyundai Heavy Ind. | Saudi Aramco Cogeneration Program(UGP) | Pipe Spool Fabrication | 3 | 2005.06 | 2005 | |||||
27 | Hyundai Heavy Ind. | Saudi Aramco Cogeneration Program(UGP) | Pipe Spool Fabrication | 3 | 2005.05 | 2005 | |||||
28 | Samsung Total Petrochemicals. | No.2 Aromatics Complex Project /Desan, Korea | Process piping | 2013.04 | A335P9, A312TP310, A312TP347H | 2012 | |||||
29 | DeokYang Co.,Ltd. | HC-Project (Steam Reformer package H-211) /Ulsan, Korea | Process piping | 2013.09 | A106GrB, A335P11, A335P22, A312TP304H | 2013 | |||||
30 | Aramco / GS E&C | Rabigh II (CP-3/4) Project (P220-FR-2301/2302) / Saudi Arabia | Process piping | 2014.1 | A335Gr11, A312TP310 | 2014 | |||||
31 | Hyosung | Ulsan DH-2P / Ulsan,Korea | Process piping | 2014.11 | A106GrB | 2014 | |||||
32 | State Oil Company / Samsung Engineering Co.,Ltd | SOCAR Ammonia & Urea Complex(Steam Reformer & Start-up heater)/Azerbaijan Republic | Process piping | 2015. 05 | A312 TP347, TP321, TP304H, A335P11, P22 & A106GRB | 2014 | |||||
33 | Samsung Total Petrochemicals / Samsung C&T | STC SM#1 Modernization Project /Desan, Korea | Process piping | 2015.05 | A297HP Modified, 800HTB409, TP304H, A312TP310, A312TP347H | 2014 | |||||
34 | ADCO / GS E&C | Rumaitha/shanayel Phase-III Project /Abu Dhabi, UAE | Process piping | 2015.07 | A106GRB | 2015 | |||||
35 | Turkmengas / Toyo-K | ECU & PE-PP Project | Process piping | 2015.12 | A106GRB | 2015 | |||||
36 | KNPC / GS E&C | KNPC Clean Fuel Project _Reformer Package / Kuwait | Process piping | 2016.05 | A312TP304H, 321H,A335P11,P22 & A106GRB | 2015 | |||||
37 | KNPC / GS E&C | KNPC Clean Fuel Project _Fired Heater Package / Kuwait | Process piping | 2016.03 | A106GRB, A312TP347H & TP310 | 2015 | |||||
38 | S-OIL / DAELIM | S-OIL RUC Project _Fired Heater Fabrication & Erection | Process piping | 2016.08 | A312TP347H & TP304 | 2016 | |||||
39 | TE-3 / GS E&C | TE-3 Project_Flue Gas Cooler | Process piping | 2016.1 | A106GRB,A312TP304 | 2016 | |||||
40 | OCI | OCI BTX DBNK Project | Process piping | 2016.1 | A312 TP321 | 2016 | |||||
41 | SK ENERGY | SK NO.2 FCC Project Fabrication & Erection | Process piping | 2016.11 | A335 P22 | 2016 | |||||
42 | S-OIL / DAELIM | S-OIL RUC Project _Burner Piping Fabrication & Erection | Process piping | 2017.09 | A106 GR.B | 2017 | |||||
43 | SK ENERGY | SK NO.1 FCC DBNK Project | Process piping | 2017.04 | SS304 | 2017 | |||||
44 | DeokYang Co.,Ltd. | DeokYang # 3 Factory E-213 Revamping Project | Process piping | 2017.03 | A335 P11 | 2017 | |||||
45 | Hyundai Oil Bank Co., Ltd | HDO SDA Project Hot Oil Heater Fabrication & Erection / Korea | Process piping | 2018.04 | A106 GR.B | 2017 | |||||
46 | DeokYang Co.,Ltd. | DY HC-2 Project Steam Reformer Fabrication / Korea | Process piping | 2018.04 | Coil 6,160 D.I | 2017 | |||||
47 | GS E&C | LPIC-3 WHRU PROJECT / OMAN | Process piping | 2018.05 | A335 P22 | 2017 | |||||
48 | Hyundai Oil Bank Co., Ltd | HDO Revamping Project / Fabrication & Erection / Korea | Process piping | 2018.08 | TP347H | 2018 | |||||
49 | Lotte Chemical | MEX 3 Project / Fabrication & Erection / Korea | Process piping | 2019.04 | A106 GR.B | 2018 | |||||
50 | Hancha Chemical | VCM-3 Project / | Process piping | 2019.03 | B407 800H, A312 TP347H, A335 P5 | 2019 | |||||
51 | GS CALTEX | MFC Project | Process piping | 2020.08 | A106 GR.B, TP304H, A335 P11, HP Modified | 2019 |
주요실적
No. | Customer/ End User | Project | Item | Q’ty | Delivery | Material | Dimension (mm) | Weight (Ton) | 년도 | ||
ID | t | L | |||||||||
1 | WOONGJIN COWAY ENTEC | ADNOC CFP WTP PROJECT | VESSEL | 21 | On-Going | SA516-70N | 3600 | 23 | 3500 | 183 | 2019 |
2 | Lotte E&C | B PROJECT | VESSEL | 34 | On-Going | SA240-304L | 4200 | 30 | 9300 | 220 | 2019 |
3 | MCNS | REACTOR FABRICATION | REACTOR | 3 | On-Going | SA240-316L | 3000 | 14 | 4400 | 42 | 2019 |
4 | SATCO | IEFCL 1562 | REACTOR | 2 | On-Going | SA516-70+316L | 2700 | 95+3 | 10800 | 190 | 2019 |
5 | Lotte E&C | MeX3 Projcet | Column | 2 | On-Going | SA516-70N | 5300 | 47 | 24800 | 400 | 2019 |
6 | Lotte E&C | MeX3 Projcet | Vessel | 21 | On-Going | SA516-70N | 4200 | 29 | 13500 | 274 | 2019 |
7 | Husky Oil Operation | 10000 BPD SAGD TEMPLATE | Test Separator | 4 | On-Going | SA516-70N | 1981 | 38 | 6096 | 75 | 2019 |
5 | E-TECH E&C | ALK Y4 | COLUMN | 2 | 2019.03 | A516-70/316L | 1700 | 23 | 23100 | 98 | 2018 |
9 | SATCO | Feed Purifier | Vessel | 1 | 2019.03 | SA516-70N | 2300 | 55 | 11000 | 45 | 2018 |
10 | Solvay Korea | D61200 | Column | 1 | On-Going | SA240-304L | 3000 | 15 | 13900 | 22 | 2019 |
11 | Lotte E&C | HC2 Project | Vessel | 6 | 2019.04 | SA516-70N+S5 | 4700 | 50 | 26000 | 260 | 2018 |
12 | Lotte E&C | HC2 Project | Tower & Reactor | 2 | 2018.11 | SA516-70N | 2300 | 120 | 8700 | 88 | 2018 |
13 | Husky Oil Operation | Well Pad Long Lead Program | Test Separator | 3 | 2018.11 | SA516-70N | 1981 | 38 | 6096 | 56 | 2018 |
14 | Hyundai Engineering | LPC2 Project | Tower | 8 | 2018.11 | SA240-304 / 316 | 2050 | 42 | 42270 | 410 | 2018 |
15 | Jord International Pty Ltd | WHCP 2021 – Cashiriari Well Head Compression Project | Scrubber | 3 | 2018.09 | SA516-70N | 2540 | 100 | 6440 | 92 | 2018 |
16 | TOYO ENG | KD Project | Reactor | 14 | 2018.09 | SA240-310S | 1150 | 8 | 1150 | 16 | 2018 |
17 | TOYO ENG | KD Project | Pressure Vessel | 4 | 2018.09 | SA240-304L | 1200 | 11 | 2950 | 5 | 2018 |
18 | Jord International Pty Ltd | Wodgina Lithium 6% Li2O Project | Receiver Tank | 2 | 2018.06 | SA516-70N | 1484 | 8 | 2568 | 3 | 2018 |
19 | Husky Oil Operation | Dee Vally Project (DB-PAD) | Test Separator | 1 | 2018.05 | SA516-70N | 1981 | 38 | 6096 | 19 | 2018 |
20 | Husky Oil Operation | Dee Vally Project (DA-PAD) | Test Separator | 1 | 2018.05 | SA516-70N | 1981 | 38 | 6096 | 18.6 | 2018 |
21 | Jord International Pty Ltd | Byerwen Project | Receiver Tank | 1 | 2018.04 | SA516-70N | 2496 | 10 | 2500 | 3.7 | 2017 |
22 | Cryostar | Eugene Project | Desuperheater | 1 | 2018.03 | SA240-304L | 330.2 | 6 | 2650 | 0.52 | 2017 |
23 | Jord International Pty Ltd | Mount Marion Lithium – 6% Upgrade Project | Receiver Tank | 1 | 2018.03 | SA516-70N | 2000 | 8 | 2600 | 2.6 | 2017 |
24 | Jord International Pty Ltd | Mount Marion Lithium – 6% Upgrade Project | Receiver Tank | 1 | 2018.03 | SA516-70N | 1484 | 8 | 2568 | 1.5 | 2017 |
25 | Husky Oil Operation | Vawn Project | Test Separator | 1 | 2018.01 | SA516-70N | 1981 | 38 | 6096 | 18.6 | 2017 |
26 | Husky Oil Operation | Edam East Project | Test Separator | 1 | 2018.01 | SA516-70N | 1981 | 38 | 6096 | 18.6 | 2017 |
27 | Husky Oil Operation | Pikes Peak South Project | Test Separator | 1 | 2018.01 | SA516-70N | 1981 | 38 | 6096 | 18.6 | 2017 |
28 | Cryostar | STARLITE XS – Small Scale Liquefaction Unit | Buffer Tank | 1 | 2018.03 | SA516-70 | 1000 | 16 | 2356 | 2.2 | 2017 |
29 | Cryostar | STARLITE XS – Small Scale Liquefaction Unit | Inventory Tank | 1 | 2018.03 | SA516-70N | 1776 | 28 | 3500 | 8.5 | 2017 |
30 | Husky Oil Operation | Rush Lake Commercial 2 P/Q/Pads | Test Separator | 1 | 2017.08 | SA516-70N | 1981 | 38 | 6096 | 37.2 | 2017 |
31 | KPX Green Chemical | AM Project | Tower | 1 | 2016.08 | SA240-316 | 1100 | 9 | 21500 | 9.8 | 2016 |
No. | Customer/ End User | Project | Item | Q’ty | Delivery | Material | Dimension (mm) | Weight (Ton) | 년도 | ||
ID | t | L | |||||||||
1 | MCNS | Condensor Project | Heat Exchanger | 2 | On-Going | SA516-70 | 600 | 9 | 2500 | 2.5 | 2019 |
2 | JORD INTERNATIONAL | KWINANA NICKEL RERINERY PROJECT | Heat Exchanger | 1 | On-Going | S31803 | 2182 | 10 | 9500 | 25.1 | 2019 |
3 | Lotte E&C | MeX3 Project | Heat Exchanger | 9 | On-Going | SA516-70 | 2190 | 13 | 6300 | 66 | 2019 |
4 | Lotte E&C | HC2 Project | Heat Exchanger | 15 | 2018.09 | SA240-304 | 3190 | 18 | 6000 | 336 | 2018 |
5 | SHI | SN2197/98 | Water Heater | 2 | 2018.03 | SA240-304 | 370 | 6 | 1981 | 1.2 | 2017 |
6 | Cryostar | STARLITE XS – Small Scale Liquefaction Unit | Desuper Heater | 1 | 2018.03 | SA312-TP304L | 330.2 | 6 | 2650 | 0.5 | 2017 |
No. | Customer/ End User | Project | Item | Q’ty | Delivery | Material | Dimension (mm) | Weight (Ton) | 년도 | ||
ID | t | L | |||||||||
1 | John Zink Hamworthy Combustion | BLNG PROJECT | Flare Stack | 1 | 2015 | A106-B | 333.35 | 9.5 | 41 | 0.69 | 2015 |
2 | John Zink Hamworthy Combustion | HEC TACE Project | Flare Stack Pakage | 1 | 2015 | A516-70n+S5 | 1700 | 32 | 100,000 | 50 | 2015 |
3 | John Zink International Luxembourg /Saudi Aramco | Shaybah#1 | B58-U-0001A/B | 2 | 2013 | A516-70 | 3000 | 14 | 58,000 | 150 | 2013 |
4 | Shaybah#1 | B58-U-0002A/B/C | 3 | 2013 | A516-70 | 1066 | 14 | 81,200 | 120 | 2013 | |
5 | Shaybah#1 | B58-U-0006 | 1 | 2013 | A516-70 | 1,219 | 10 | 58,000 | 8 | 2013 | |
6 | Shaybah#4 | B25-F-0004A | 1 | 2013 | A516-70 | 1,219 | 12 | 92,800 | 50 | 2013 | |
7 | Shaybah#4 | B01/03-F0002A/0004A | 4 | 2013 | A516-70 | 1,066 | 12 | 92,800 | 180 | 2013 | |
8 | Shaybah#4 | B07-F-0004A | 1 | 2013 | A516-70 | 610 | 10 | 46,400 | 11 | 2013 |
No. | Ship Yard | Hull No. | TYPE | Material | Dimension (mm) | Weight (Ton) | Delivery | ||||||||
GCU ASS’Y | Outer Casing (shell) | Inner Cylinder (shell) | |||||||||||||
Outer Casing | Inner Cylinder | O.D | L | O.D | T | L | O.D | T | L | ||||||
1 | HSHI | HNS627 | 4500 | Carbon Steel | SUS 316L | 4500 | 11095 | 4030 | 8 | 8267 | 3580 | 5 | 7455 | 24 | 2014.08 |
2 | SHI | HN1942 | 5600 | Carbon Steel | SUS 316L | 5000 | 12916 | 4510 | 8 | 9742 | 4010 | 5 | 8795 | 27 | 2014.05 |
3 | HHI | HN2567 | SUS | SUS 304L | SUS 316L | 4500 | 11095 | 4030 | 5 | 8267 | 3580 | 5 | 7455 | 24 | 2014.04 |
4 | DSME | HN2292 | 4500 | Carbon Steel | SUS 316L | 4500 | 12320 | 4030 | 8 | 9492 | 3580 | 5 | 8680 | 26 | 2014.03 |
5 | HSHI | HNS626 | 4500 | Carbon Steel | SUS 316L | 4500 | 11095 | 4030 | 8 | 8267 | 3580 | 5 | 7455 | 24 | 2014.02 |
6 | HHI | HN2566 | SUS | SUS 304L | SUS 316L | 4500 | 11095 | 4030 | 5 | 8267 | 3580 | 5 | 7455 | 24 | 2014.01 |
7 | SHI | HN1941 | 5600 | Carbon Steel | SUS 316L burner | 5000 | 12916 | 4510 | 8 | 9742 | 4010 | 5 | 8795 | 27 | 2013.10 |
8 | HHI | HN2565 | SUS | SUS 304L | SUS 316L burner | 4500 | 11095 | 4030 | 5 | 8267 | 3580 | 5 | 7455 | 24 | 2013.07 |
9 | SHI | HN1921 | 5600 | Carbon Steel | SUS 316L burner | 5000 | 12916 | 4510 | 8 | 9742 | 4010 | 5 | 8795 | 27 | 2013.07 |
10 | HHI | HN2550 | 5600 | Carbon Steel | SUS 316L | 5000 | 12916 | 4510 | 8 | 9742 | 4010 | 5 | 8795 | 27 | 2013.06 |
11 | SHI | HN1920 | 5600 | Carbon Steel | SUS 316L burner | 5000 | 12916 | 4510 | 8 | 9742 | 4010 | 5 | 8795 | 27 | 2013.05 |
12 | HHI | HN2548 | 5600 | Carbon Steel | SUS 316L | 5000 | 12916 | 4510 | 8 | 9742 | 4010 | 5 | 8795 | 27 | 2013.04 |
13 | HHI | HN2558 | SUS | SUS 304L | SUS 316L | 4500 | 11095 | 4030 | 5 | 8267 | 3580 | 5 | 7455 | 24 | 2013.03 |
14 | DSME | HN2291 | 4500 | Carbon Steel | SUS 316L | 4500 | 12320 | 4030 | 8 | 9492 | 3580 | 5 | 8680 | 26 | 2013.03 |
15 | HSHI | HNS625 | 4500 | Carbon Steel | SUS 316L | 4500 | 11095 | 4030 | 8 | 8267 | 3580 | 5 | 7455 | 24 | 2013.02 |
16 | DSME | HN2402 | 5600 | Carbon Steel | SUS 316L | 5000 | 12916 | 4510 | 8 | 9742 | 4010 | 5 | 8795 | 27 | 2013.01 |
17 | DSME | HN2296 | 4500 | Carbon Steel | SUS 316L | 4500 | 12320 | 4030 | 8 | 9492 | 3580 | 5 | 8680 | 26 | 2012.12 |
18 | HSHI | HNS624 | 4500 | Carbon Steel | SUS 316L | 4500 | 11095 | 4030 | 8 | 8267 | 3580 | 5 | 7455 | 24 | 2012.11 |
19 | HHI | HN2557 | SUS | SUS 304L | SUS 316L | 4500 | 11095 | 4030 | 5 | 8267 | 3580 | 5 | 7455 | 24 | 2012.10 |
20 | HHI | HN2580 | SUS | SUS 304L | SUS 316L | 4500 | 11095 | 4030 | 5 | 8267 | 3580 | 5 | 7455 | 24 | 2012.09 |
21 | DSME | HN2290 | 4500 | Carbon Steel | SUS 316L | 4500 | 12320 | 4030 | 8 | 9492 | 3580 | 5 | 8680 | 26 | 2012.08 |
22 | HHI | HN2556 | SUS | SUS 304L | SUS 316L | 4500 | 11095 | 4030 | 5 | 8267 | 3580 | 5 | 7455 | 24 | 2012.08 |
23 | DSME | HN2295 | 4500 | Carbon Steel | SUS 316L | 4500 | 12320 | 4030 | 8 | 9492 | 3580 | 5 | 8680 | 26 | 2012.07 |
24 | DSME | HN2289 | 4500 | Carbon Steel | SUS 316L | 4500 | 12320 | 4030 | 8 | 9492 | 3580 | 5 | 8680 | 26 | 2012.06 |
25 | DSME | HN2288 | 4500 | Carbon Steel | SUS 316L | 4500 | 12320 | 4030 | 8 | 9492 | 3580 | 5 | 8680 | 26 | 2012.05 |
No. | Customer/ End User | Project | Item | Q’ty | Delivery | Material | Dimension (mm) | Weight (Ton) | 년도 | ||
ID | t | L | |||||||||
1 | Husky Energy | Spruce Lake North SLA Pad | Ship Loose Pipe | 1 | On-Going | A106B | 2019 | ||||
2 | Husky Energy | Spruce Lake North SLD Pad | Ship Loose Pipe | 1 | On-Going | A106B | 2019 | ||||
3 | Husky Energy | Spruce Lake North CPF 509 | Ship Loose Pipe | 1 | On-Going | A106B | 2019 | ||||
4 | Husky Energy | Spruce Lake Central SLB Pad | Ship Loose Pipe | 1 | On-Going | A106B | 2019 | ||||
5 | Husky Energy | Spruce Lake Central SLC Pad | Ship Loose Pipe | 1 | On-Going | A106B | 2019 | ||||
6 | Husky Energy | Spruce Lake Central CPF 509 | Ship Loose Pipe | 1 | On-Going | A106B | 2019 | ||||
7 | Husky Energy | Vawn VC2 Pad | Ship Loose Pipe | 1 | 2018.12 | A106B | 2018 | ||||
8 | Husky Energy | Dee Valley DA Pad | Ship Loose Pipe | 1 | 2018.11 | A106B | 2018 | ||||
9 | Husky Energy | Celtic CN Pad | Ship Loose Pipe | 1 | 2018.08 | A106B | 2018 | ||||
10 | Husky Energy | Dee Valley DB Pad | Ship Loose Pipe | 1 | 2018.07 | A106B | 2018 | ||||
11 | Husky Energy | Dee Valley CPF 509 | Ship Loose Pipe | 1 | 2018.06 | A106B | 2018 | ||||
12 | Husky Energy | Vawn VC Pad | Ship Loose Pipe | 1 | 2018.05 | A106B | 2018 | ||||
13 | Jord International | C6721 Imperial Sugar GAC | Ship Loose Pipe | 1 | 2018.04 | 2017 | |||||
14 | Husky Energy | Edam East EC Pad | Ship Loose Pipe | 1 | 2018.03 | A106B | 2017 | ||||
15 | Husky Energy | Rush Lake Commercial 2 CPF 509 | Ship Loose Pipe | 1 | 2017.10 | A106B | 2017 | ||||
16 | Burckhardt Compression AG/ DSME | HN.2435/36 | Pipe Spool | 6 | 2017.04 | A312 TP316L | 2016 | ||||
17 | Burckhardt Compression AG/ DSME | HN.2417 | Pipe Spool | 6 | 2017.02 | A312 TP316L | 2016 | ||||
18 | Burckhardt Compression AG/ DSME | HN.2153/54 | Pipe Spool | 6 | 2016.12 | A312 TP316L | 2016 |