제품소개

YoungKwang의 최고의 품질 제품들을 소개합니다.
contact-us-icon@2x.png

·Client

Cheil Industries

·PJT

CPC2 65,000 MTY

·Item

-

·Material

·Size

12T x 4,400mm I.D x 9,700L

·Weight

10.2 ton

·Client

Lotte Chemical

·PJT

TE-3 Project (Naphtha Cracking Center Expansion)

·Item

Quench Exchanger Steam Drum

·Material

·Size

t80mm x I.D 1,500mm x T.L 5,000mm

·Weight

25 ton

·Client

Jord International

·PJT

WHCP2021 Cashiriari Wellhead Compression

·Item

1st Stage Compress Suction Scrubber

·Material

·Size

t100mm x I.D 2,540mm x T.L 3,884mm

·Weight

48 ton

·Client

Daewoo E&C

·PJT

Ammonia and urea fertilizer factory for Train-2

·Item

Slug Catcher (2 sets)

·Material

·Size

t(95+3)mm x I.D 2,700mm x T.L 10,800mm

·Weight

95 Ton

·Client

Lotte Chemical (Lotte E&C)

·PJT

HC2 PJT

·Item

E-19321(H-BKM)

·Material

·Size

18 t x / I.D 2300mm & 3190mm x 6000 T.L

·Weight

67.3 ton

·Client

Lotte Chemical (Lotte E&C)

·PJT

HC2 PJT

·Item

E-1815(V-BEM Type)/I.D2330 x 8987 T.L

·Material

·Size

Steel : 800 ton Coil : 7,200 D.I

·Weight

70.8 ton

·Client

Lotte Chemical (Lotte E&C)

·PJT

HC2 PJT

·Item

E-1921(H-BKU)&E-1922(H-BJM)

·Material

·Size

Thickness : 13 mm / 13 mm

·Weight

8.3 / 30.3 ton

·Client

Lotte E&C / HC2 PJT

·PJT

E-1935 (V-BEM)/ I.D 1620 x 3800 T.L

·Item

-

·Material

·Size

Shell Thickness : 30 mm

·Weight

-

·Client

Lotte Chemical (Lotte E&C)

·PJT

HC2 PJT

·Item

E-19321(H-BKM)

·Material

·Size

18 t x / I.D 2300mm & 3190mm x 6000 T.L

·Weight

67.3 ton

·Client

Cheil Industries Ltd

·PJT

CPC2 (65,000 MTY)

·Item

-

·Material

·Size

16mm x 3,000 I.D x 45,000 L

·Weight

249.6 ton

·Client

Lotte Chemical & Hyundai Engineering

·PJT

LPC2

·Item

-

·Material

·Size

16 mm x 2,000 I.D x 35,000 L

·Weight

99.2 ton

·Client

Air Liquid (e-TEC E&C)

·PJT

ALK Y4 Project

·Item

-

·Material

·Size

23mm x 1,700 I.D x 23,100 L

·Weight

98.0 ton

·Client

Lotte Chemical & Hyundai Engineering

·PJT

LPC2

·Item

-

·Material

·Size

47 mm x 2,050 I.D x 42,270 L

·Weight

410 ton

·Client

Samsung Total Petrochemicals

·PJT

No.2 Aromatics Complex

·Item

-

·Material

·Size

22t x 4,700 I.D x 47,400 L

·Weight

624 ton

·Client

Samsung Total Petrochemicals

·PJT

No.2 Aromatics Complex

·Item

-

·Material

·Size

22t x 4,700 I.D x 47,400 L

·Weight

624 ton

·Client

Lotte Chemical & Hyundai Engineering

·PJT

LPC2

·Item

-

·Material

·Size

47 mm x 2,050 I.D x 42,270 L

·Weight

410 ton

·Client

Cheil Industries Ltd

·PJT

CPC2 (65,000 MTY)

·Item

-

·Material

·Size

16mm x 3,000 I.D x 45,000 L

·Weight

249.6 ton

·Client

Lotte Chemical & Hyundai Engineering

·PJT

LPC2

·Item

-

·Material

·Size

16 mm x 2,000 I.D x 35,000 L

·Weight

99.2 ton

·Client

Air Liquid (e-TEC E&C)

·PJT

ALK Y4 Project

·Item

-

·Material

·Size

23mm x 1,700 I.D x 23,100 L

·Weight

98.0 ton

·Client

Lotte Chemical (Lotte E&C)

·PJT

HC2 Project

·Item

First EC Reactor

·Material

·Size

t(117+3)mm x I.D 2,300mm x T.L 9,200mm

·Weight

97ton

Piping Spool

마스크-그룹-66@2x.png
마스크-그룹-69@2x.png
마스크-그룹-67@2x.png
마스크-그룹-70@2x.png
마스크-그룹-68@2x.png
마스크-그룹-71@2x.png

Process Piping

process-piping@2x.png

Piping Reference

(5). Pipe Spool Reference List
No.
Customer/ End User
Project
Item
Q'ty
Delivery
Material
Dimension (mm)
Weight (Ton)
년도
ID t L
1 Husky Energy Spruce Lake North SLA Pad Ship Loose Pipe 1 On-Going A106B 2019
2 Husky Energy Spruce Lake North SLD Pad Ship Loose Pipe 1 On-Going A106B 2019
3 Husky Energy Spruce Lake North CPF 509 Ship Loose Pipe 1 On-Going A106B 2019
4 Husky Energy Spruce Lake Central SLB Pad Ship Loose Pipe 1 On-Going A106B 2019
5 Husky Energy Spruce Lake Central SLC Pad Ship Loose Pipe 1 On-Going A106B 2019
6 Husky Energy Spruce Lake Central CPF 509 Ship Loose Pipe 1 On-Going A106B 2019
7 Husky Energy Vawn VC2 Pad Ship Loose Pipe 1 2018.12 A106B 2018
8 Husky Energy Dee Valley DA Pad Ship Loose Pipe 1 2018.11 A106B 2018
9 Husky Energy Celtic CN Pad Ship Loose Pipe 1 2018.08 A106B 2018
10 Husky Energy Dee Valley DB Pad Ship Loose Pipe 1 2018.07 A106B 2018
11 Husky Energy Dee Valley CPF 509 Ship Loose Pipe 1 2018.06 A106B 2018
12 Husky Energy Vawn VC Pad Ship Loose Pipe 1 2018.05 A106B 2018
13 Jord International C6721 Imperial Sugar GAC Ship Loose Pipe 1 2018.04 2017
14 Husky Energy Edam East EC Pad Ship Loose Pipe 1 2018.03 A106B 2017
15 Husky Energy Rush Lake Commercial 2 CPF 509 Ship Loose Pipe 1 2017.10 A106B 2017
16 Burckhardt Compression AG/ DSME HN.2435/36 Pipe Spool 6 2017.04 A312 TP316L 2016
17 Burckhardt Compression AG/ DSME HN.2417 Pipe Spool 6 2017.02 A312 TP316L 2016
18 Burckhardt Compression AG/ DSME HN.2153/54 Pipe Spool 6 2016.12 A312 TP316L 2016
19 Burckhardt Compression/POSCO POSCO SNG Pipe Spool 1Lot 2014.01 2013
20 Burckhardt Compression /Samsung Total Samsung Daesan 03,04 Pipe Spool 1Lot 2013.12 2013
21 Burckhardt Compression/POSCO POSCO GWANGYANG Pipe Spool 1 2013.11 2013
22 Hyundai Heavy Ind. AL Dur Power & Water Company B.S.C© AL Dur Independent Water and Power Fabrication Pipe Spool 1 2010.01 2009
23 Hyundai Heavy Ind. Escravos Gas Proj Phase3(EGP3) Tie-in Spool (G05011-086-04) 1 2006.09 2006
24 Hyundai Heavy Ind. Escravos Gas Proj Phase3(EGP3) Tie-in Spool / Tie-in Spool Support (G05011-086-04) 25 2006.09 2006
25 Hyundai Heavy Ind. Escravos Gas Proj Phase3(EGP3) Tie-in Spool (G05011-086-01~03) 13 2006.01 2005
26 Hyundai Heavy Ind. Saudi Aramco Cogeneration Program(UGP) Pipe Spool Fabrication 3 2005.06 2005
27 Hyundai Heavy Ind. Saudi Aramco Cogeneration Program(UGP) Pipe Spool Fabrication 3 2005.05 2005
28 Samsung Total Petrochemicals. No.2 Aromatics Complex Project /Desan, Korea Process piping 2013.04 A335P9, A312TP310, A312TP347H 2012
29 DeokYang Co.,Ltd. HC-Project (Steam Reformer package H-211) /Ulsan, Korea Process piping 2013.09 A106GrB, A335P11, A335P22, A312TP304H 2013
30 Aramco / GS E&C Rabigh II (CP-3/4) Project (P220-FR-2301/2302) / Saudi Arabia Process piping 2014.1 A335Gr11, A312TP310 2014
31 Hyosung Ulsan DH-2P / Ulsan,Korea Process piping 2014.11 A106GrB 2014
32 State Oil Company / Samsung Engineering Co.,Ltd SOCAR Ammonia & Urea Complex(Steam Reformer & Start-up heater)/Azerbaijan Republic Process piping 2015. 05 A312 TP347, TP321, TP304H, A335P11, P22 & A106GRB 2014
33 Samsung Total Petrochemicals / Samsung C&T STC SM#1 Modernization Project /Desan, Korea Process piping 2015.05 A297HP Modified, 800HTB409, TP304H, A312TP310, A312TP347H 2014
34 ADCO / GS E&C Rumaitha/shanayel Phase-III Project /Abu Dhabi, UAE Process piping 2015.07 A106GRB 2015
35 Turkmengas / Toyo-K ECU & PE-PP Project Process piping 2015.12 A106GRB 2015
36 KNPC / GS E&C KNPC Clean Fuel Project _Reformer Package / Kuwait Process piping 2016.05 A312TP304H, 321H,A335P11,P22 & A106GRB 2015
37 KNPC / GS E&C KNPC Clean Fuel Project _Fired Heater Package / Kuwait Process piping 2016.03 A106GRB, A312TP347H & TP310 2015
38 S-OIL / DAELIM S-OIL RUC Project _Fired Heater Fabrication & Erection Process piping 2016.08 A312TP347H & TP304 2016
39 TE-3 / GS E&C TE-3 Project_Flue Gas Cooler Process piping 2016.1 A106GRB,A312TP304 2016
40 OCI OCI BTX DBNK Project Process piping 2016.1 A312 TP321 2016
41 SK ENERGY SK NO.2 FCC Project Fabrication & Erection Process piping 2016.11 A335 P22 2016
42 S-OIL / DAELIM S-OIL RUC Project _Burner Piping Fabrication & Erection Process piping 2017.09 A106 GR.B 2017
43 SK ENERGY SK NO.1 FCC DBNK Project Process piping 2017.04 SS304 2017
44 DeokYang Co.,Ltd. DeokYang # 3 Factory E-213 Revamping Project Process piping 2017.03 A335 P11 2017
45 Hyundai Oil Bank Co., Ltd HDO SDA Project Hot Oil Heater Fabrication & Erection / Korea Process piping 2018.04 A106 GR.B 2017
46 DeokYang Co.,Ltd. DY HC-2 Project Steam Reformer Fabrication / Korea Process piping 2018.04 Coil 6,160 D.I 2017
47 GS E&C LPIC-3 WHRU PROJECT / OMAN Process piping 2018.05 A335 P22 2017
48 Hyundai Oil Bank Co., Ltd HDO Revamping Project / Fabrication & Erection / Korea Process piping 2018.08 TP347H 2018
49 Lotte Chemical MEX 3 Project / Fabrication & Erection / Korea Process piping 2019.04 A106 GR.B 2018
50 Hancha Chemical VCM-3 Project / Process piping 2019.03 B407 800H, A312 TP347H, A335 P5 2019
51 GS CALTEX MFC Project Process piping 2020.08 A106 GR.B, TP304H, A335 P11, HP Modified 2019

주요실적